Before anyone can design a house, extend a building or plan a development, they need to know exactly where it will sit on its land. A site plan is the drawing that records this. It shows the property boundaries, the position of existing and proposed buildings, access, levels, drainage and the features around them, and it is usually the first sheet that planners, engineers and contractors look at.
This article explains what the drawing contains, how it differs from related drawings, how to read one, and why the information on it matters for structure and construction as much as for planning approval. It also notes how the drawing is used in Singapore submissions.
What a site plan is
It is a scaled, top-down drawing of a whole property and its immediate surroundings. Unlike a floor plan, which shows the interior of one level, it shows the building as a footprint or roof outline within its plot, together with everything outside the walls: driveways, paths, gardens, boundary walls, drains, trees, utility connections and neighbouring structures.
It sits within a hierarchy of drawings. A location plan, at a small scale, shows where the site is within the wider neighbourhood. The next drawing down zooms in to the property. Floor plans, sections and elevations then describe the building itself. Our guide on how to read house plans explains how these sheets fit together.
What the drawing contains
The exact content varies with the purpose of the drawing, but a complete drawing for a building project usually includes the following.
- Boundaries: the legal lot lines, with dimensions, often based on a survey.
- North point and scale: essential for orientation and for measuring distances.
- Buildings: existing and proposed structures, with their footprint and distances to boundaries.
- Setbacks and buffers: the required clearances from roads and neighbouring lots.
- Access: driveways, gates, car porches and the connection to the public road.
- Levels: spot heights or contours describing the existing and proposed ground, and finished floor levels.
- Drainage: roof and surface water routes, drains, sumps and the connection to public drains.
- Utilities: water, sewer, electricity and telecommunications connections.
- Landscape: trees to be kept or removed, planting areas and hard paving.
On larger developments, the plan may also show site coverage and gross floor area figures. Our article on floor area ratio explains how permissible floor area relates to the size of the site.
Scale, orientation and conventions
These drawings are made at smaller scales than floor plans because they cover a larger area. For a house, 1:200 or 1:500 is common, while larger sites may use 1:1000. As with any drawing, written dimensions should be relied on rather than measurements taken from a print, which may not have been reproduced at its true scale.
The north point shows how the building is oriented, which matters for sun, shading and natural ventilation. Boundary lines are usually drawn as heavy chain or dashed lines; existing buildings may be shown hatched or in grey, with proposed work in bold. Levels are typically given in metres relative to a reference datum, and a legend should explain any symbols used.
Site plan versus related drawings
Several drawings look similar but serve different purposes. A survey plan records what exists, measured by a surveyor, including boundaries, levels, trees and structures. The designer’s drawing uses that survey as a base and adds the proposed design. A landscape plan focuses on planting and external finishes. A site analysis drawing, discussed in our guide to site analysis in architecture, records the qualities of the site, such as sun paths, wind, views and noise, that inform the design before any building is drawn.
Confusing these causes problems. A layout drawn without an accurate survey may place a building in the wrong position relative to the true boundary or misjudge level differences, both of which can be costly to correct once construction has begun.
Why it matters for structure
From an engineering perspective, this sheet is where many risks first become visible. It reveals how close the new building is to neighbouring structures, which determines whether excavation could affect their foundations and whether temporary support or monitoring will be needed. It shows level differences across the site, which indicate whether retaining walls are required. It shows the location of existing drains, sewers and services, which constrain where foundations and piles can go.
The same drawing also guides the ground investigation. Borehole positions are selected with reference to it, so that the soil information covers the footprint of the building and any critical areas such as basements or retaining walls. Our article on site investigation describes how that work is planned and interpreted.
Use in Singapore submissions
In Singapore, this drawing forms part of the drawings submitted for planning permission to the Urban Redevelopment Authority and for building plan approval to the Building and Construction Authority. It must show the proposal in relation to the lot boundaries and the controls that apply to the site, such as setbacks, road buffers and, for landed housing, the relevant envelope controls. Other agencies may need to review aspects such as drainage, access and utilities.
Submissions are made by a qualified person, usually a registered architect or Professional Engineer, and boundary information generally comes from a survey by a registered surveyor. For owners, the practical point is that an accurate site plan underpins every later approval and much of the structural design, which is why our structural consultancy reviews it closely at the start of any landed or redevelopment project.
How to read one as an owner
When you receive the drawing for your property, start with the north point and scale, then trace the boundary. Check that the building footprint sits where you expect relative to the road and neighbours, and that the setback dimensions are shown. Look at the levels to understand whether the ground slopes and where the finished floor level sits relative to the road. Finally, follow the drainage arrows from the roof and paved areas to the public drain to see how water leaves the site. A few minutes spent on this reading often prompts the most useful questions for the design team.
Frequently asked questions
What is the difference between a site plan and a floor plan?
A site plan shows the whole property from above, including boundaries, the building footprint, access, levels and drainage, while a floor plan shows the internal layout of one level of the building, such as rooms, walls, doors and windows.
What scale is a site plan usually drawn at?
For a house, they are commonly drawn at 1:200 or 1:500, with larger sites at 1:1000, but the stated scale and written dimensions on the drawing should always be checked rather than measuring a printout.
Who prepares a site plan?
The architect or engineer usually prepares it for a project, using a survey by a registered surveyor as the base so that boundaries, levels and existing features are accurately recorded.
Do I need a site plan for a renovation in Singapore?
Works that affect the building’s footprint, envelope or structure, or that require planning or building plan approval, generally need one as part of the submission, so it is best to ask your qualified person early.
How do I get a site plan of my property in Singapore?
Owners can usually obtain copies of previously approved building plans, including the site plan, by applying to BCA for archived plan records, subject to its current procedures and fees. Land boundaries are recorded in certified survey plans held by the Singapore Land Authority. For a new design, a registered surveyor normally carries out a fresh topographical and boundary survey, because old records may not reflect later changes on site.
Can I draw my own site plan?
You can sketch your own site plan to explain ideas to a designer or contractor, but drawings submitted for planning permission or building plan approval in Singapore must be prepared and endorsed by a qualified person, usually a registered architect or Professional Engineer. Boundary information should come from a registered surveyor’s survey, not from measuring an old print. A home-made drawing is a useful brief, not a construction document.
What is a platform level on a site plan?
A platform level is the height of the ground immediately around a building, and it is shown on the site plan together with the finished floor level, usually in metres above a reference datum. In Singapore, PUB sets minimum platform levels to protect buildings from flooding, typically by reference to the adjacent road and known flood levels. Check the current PUB drainage code, as the requirement affects floor heights, driveways and basement entrances.
Related reading
- Palladian Architecture: Symmetry, Porticoes and Proportion
- Indian Architecture: Temples, Stepwells and Modernism
- Ancient Egyptian Architecture: Pyramids, Temples and Stone
- Byzantine Architecture: Domes, Pendentives and Mosaics
Starting a landed or redevelopment project? Talk to our consultancy about site constraints and foundations, or get in touch.